The RM90 can be moved by suitable forklift truck or other lifting device by using common lifting practices.
It is advisable to use lifting devices to assist transport and assembly of the MAT.
The RM90 can however be assembled only using man power and manual handling of elements if required. Number of personnel assigned to lift individual elements should be adequate to elements weights and personnel lifting capabilities. It is advisable that decks and main beams are lifted by minimum of 4 men.
Matt can only be moved disassembled. Once assembled on the ground is not supposed to be moved.
Please see our Brochure below for full specifications.