Air cargo build-up & breakdown.
Pallet build-up and breakdown infrastructure for air cargo operations — 463L and ISU90 compatible.
Air Cargo Docktable load (6,136 kg)
six-bay dock operational
per bay, 2 people
air-portable dock
What Air Cargo Dock brings to the mission.
Explore Air Cargo Dock
Purpose-built for deployment.
Why it’s differentRead moreShow less
Engineered for dispersed-operations air cargo handling, expeditionary deployments, and air mobility surge operations. The ACD is a modular, air-portable high-line dock system that enables military air terminals to build, stage, and load complete 463L pallet trains independently of K-loader availability. A full six-table dock — capable of staging an entire C-17 cargo load — packs onto a single 463L pallet, deploys in under 90 minutes with two personnel and no special tools, and operates on any hardstand or dispersal area at main operating bases, forward operating locations, or contingency airfields worldwide.


Engineered, calculated and proof-tested.
How it’s builtRead moreShow less
The dock is a galvanized steel structure running stainless steel rollers; spring-loaded 463L pallet guides seat each roller in a cradle with a locking pin, and height-adjustable legs set the working height between 37.5 and 43.5 in.
Configurations: modular per-table build — one 96 × 96 in bay per table; a full six-table dock packs onto a single 463L pallet and sets up in around 90 minutes.
Engineered in from the start.
Capabilities- 463L high-line dock
- 13,500 lb bays
- Walkways & rails
- Combat-ready build
- 90-minute dock
The engineering envelope.
Specifications- Table Load Capacity
- 13,500 lb (6,136 kg)
- Bays
- six tables, one 96 × 96 in bay each
- Working height
- 37.5–43.5 in (952–1,105 mm), height-adjustable legs
- Structure
- galvanized steel
- Rollers
- stainless steel
- Transport
- 463L pallet, Air — 108" × 88" × 80" (2.743 × 2.235 × 2.032 m)
- Pack
- Flat-pack / knocked-down
- Site & setup
- Two personnel assemble each table bay in 15 minutes; a complete six-bay dock is operational within 90 minutes of unloading. No special tools, no technical manuals, no site preparation.

Match a system to your mission.
Tell BANAIR what you need to store, move, shelter, support or train for. Engineering will route you to the right application, product family and next step in one business day.




