Four documented steps, every project.
01 — The sequenceOn-site engineering visit. Load, access and freight constraints captured before anything is built.
Built and QA'd in Słupy or Dudley to drawings signed by the customer.
BANAIR-employed installers on site. No subcontractors at the customer location.
Final test, certification handover and operator training package issued.
Delivered globally — including remote and hard-to-reach sites.
02 — Global reachFull-route freight
Road, rail, sea and air freight planning across the full route — not handed to a forwarder at the factory gate.
Customs & import
Customs and import documentation prepared for the destination, with in-country channels where the route requires them.
Last-leg planning
Planning for limited-access and austere locations, where the final leg may be unpaved or access-constrained.
One relationship
One project relationship across shipping, installation and aftercare — the same team from order to support.
Installed correctly. Not handed over unfinished.
03 — Installation supportWhat installation support coversShow less
- Site-readiness review before anything ships
- Installation method and sequence planning
- Engineering or project supervision on site
- Handover documentation and operator orientation


Built around standard sizes — easier to ship, easier to relocate.
04 — Standardized footprintsWhy standard footprints matterShow less
- Pallet-, container- and ISO-compatible packing as a design constraint
- Predictable freight volumes — shipping and customs price up cleanly
- Consolidation across multiple systems on the same project
- Reusable handling spec when the system is later relocated
Shipping and installation treated as engineering requirements.
05 — Deployment risk reductionHow delivery risk is reducedShow less
- Lead-time visibility from contract to hand-over
- Documented installation method, every project
- On-site engineering and project supervision
- Post-deployment service against agreed terms

Delivered through the routes buyers already use.
06 — Procurement & registrations- Procurement
- Registered on SAM.gov for US federal procurement.
- Transport
- Packed for 463L pallet, CONNEX and 20 ft ISO; road, rail, sea and air.
- Warranty
- Five-year limited warranty on the MUDR™ ramp family and RM90 rail mat; other family terms by configuration and contract.
- Installation
- BANAIR-employed installers on site — no subcontractors at the customer location.
Delivery and installation records, in one place.
07 — Documentation you can request- Installation & shipping manuals
- Per product — e.g. MUDR-PD50 installation & shipping manual
- Packing & crating specs
- 463L · CONNEX · 20 ft ISO footprints
- Site-survey & configuration drawings
- Access, load and freight constraints
- Handover pack
- Commissioning, acceptance criteria, operator orientation
- Capability & certification pack
- IMS certificates, scope, standards mapping
Have a project that needs to be delivered, installed and supported?
Tell BANAIR Group the destination, site conditions, timeline and equipment involved. The team will package shipping, installation and support into the project plan.