Construction is under way in Słupy on a new storage hall for finished prefabricated steel structures.
- more than 1,330 m² of additional floor area
- a volume of close to 14,300 m³
The building significantly increases the capacity needed to handle the growing scale of BANAIR projects.
It is a concrete step in the development of our operations in Poland — strengthening our own infrastructure and preparing the plant for the work ahead.